ISEE-3 Status Report 7 July 2014 (evening)

As many of you know, last week we fired the thrusters on ISEE-3 to do a spin-up burn. Before the burn (actually 11 pulses on the spacecraft's hydrazine thrusters) the spin rate of ISEE-3 was 19.16 rpm. After spin-up burn it was 19.76 rpm. The original mission specifications for ISEE-3 called for a spin rate of 19.75 +/- 0.2 rpm. In other words: bullseye.

If all goes according to plan on Tuesday, 8 July, we will conduct the Trajectory Correction Maneuver (TCM). This will require a much longer firing of the spacecraft's thrusters.  Our window at Arecibo opens at 12:42 pm EDT and extends until 3:29 pm EDT. If the burn is a success we will follow up with another ranging session using the DSN to get an exact measure of the spacecraft's position, trajectory, and speed.  After that we should be good to go for our lunar flyby on 10 August.

After the last technical tag-up for today it looks like TCM will be 432-435 pulses fired in 7 segments with a total delta V of approximately 7 m/sec.

About Space College

  Space News and Other Sites