Our troubleshooting today eliminated some suspected causes of propulsion system problems. We do not think any of the valves are malfuctioning. Right now we think there is a chance that the Nitrogen used as a pressurant for the monopropellant Hydrazine propulsion system may have been depleted. That said, we still have a number of troubleshooting options yet to be explored. We have a DSN pass scheduled for Friday that will allow us to recalibrate our location information and trajectory plans for ISEE-3. Even if the L-1 halo orbit is no longer an option, we do have plans to use ISEE-3 for science in other locations within the inner solar system after the lunar flyby on 10 August.